
← All Services
Flatwork: Slabs, Sidewalks & Driveways
Precision flatwork with a finish that lasts NYC winters.
Overview
What's Included
Slabs-on-grade, DOT-compliant sidewalks, warehouse floors, and residential driveways — screeded flat, cured properly, jointed to prevent cracking.
- NYC DOT sidewalk & curb specifications
- Broom, trowel, and stamped finishes
- Fiber mesh & wire reinforcement
- Saw-cut control joints
Recent Work



FAQ
Common Questions
- Can you pull the DOT sidewalk permit?
- Yes — we pull the permit, notify utilities, and clear the violation.
- How long before we can walk on it?
- Foot traffic in 24 hours, vehicle traffic in 7 days under normal cure conditions.
Free Estimate
Need flatwork: slabs, sidewalks & driveways?
Get an honest, no-pressure estimate from our NYC crew.